New fiber construction that is designed and engineered to meet the needs of the District.
Service that are Priority One E-Rate eligible and compliant.
At a minimum, full 1 Gbps (1000 Mbps) of connectivity between each end point site and the hub site.
Each connection to your schools are matched by a at least a 1 Gbps connection at the District office eliminating any oversubscription.
Easily upgradable to 10 Gbps and beyond.
Fiber comes direct to the District, does not pass through a central office or cable head end facility.
Increased reliability and security based on the physical and logical network design.
Knowledge that as dark fiber rules change in the future, UPN is prepared to provide these types of solutions.
Cost effective long-term contracts and flexible payment options to help meet your financial requirements.
UPN is well versed in all facets of E-rate funding, as well as special state by state funding options (i.e.: OUSF in Oklahoma).
Comfort in UPN’s proven history, we have been serving schools since 1998 and currently service over 220 districts in 20 states with 165 of them having bandwidth of 1 Gigabit or more.